How Long Does a Roof Replacement Take?
By the Allabaugh Construction team · · Updated
A roof replacement is a big project, so it's natural to ask, "How long will this take?" You want your home protected and your life back to normal as quickly as possible. At Allabaugh Construction, we get this question on almost every estimate, so here's a straight answer.
For most asphalt shingle homes, a roof replacement takes anywhere from a single day to several days. Where your project lands in that range depends on the factors below.
Roof Size and Materials
The size of your roof plays the biggest role. A small ranch or Cape Cod can often be torn off and re-shingled in a day, while a large two-story home with a big, cut-up roof takes longer. The material matters too. We install architectural asphalt shingles, and those go on faster than specialty materials like slate or metal, which have their own installation requirements. Low-slope sections that need EPDM flat roofing add their own step.
Tear-Off and Decking
A replacement starts by removing the old roof down to the decking. If there are two layers of shingles, which is common on older homes in Mercer County and the Wyoming Valley, the tear-off takes longer. Once the decking is exposed, we can see its condition. Soft, rotted or delaminated boards have to be replaced before new underlayment goes on, and that can add time you can't know about until the old roof is off.
Roof Pitch and Complexity
Steep roofs require extra safety measures, such as harnesses, roof jacks and staging, and the crew has to move more carefully. Dormers, valleys, skylights and chimneys all need extra cutting and flashing work. A steep, complex roof takes longer than a simple, walkable gable of the same size.
Time of Year and Weather
Crews work year-round, but weather sets the pace. Rain, high wind and heavy snow can pause work, and a cold snap slows things down. In Northeast Pennsylvania, winters are typically colder and snowier than in central New Jersey, so winter scheduling up there takes more flexibility. If we have to stop, we protect any exposed sections and pick up as soon as it's safe. See our post on when is the best time to replace a roof for more on seasonal planning.
Access to Your Home
Driveway space for a dumpster and material delivery, tight side yards, landscaping and fences all affect how smoothly the job runs. We'll talk through setup with you ahead of time and protect your property during the work.
Does a Replacement Take Longer Than New Construction?
Generally, yes. A replacement includes tearing off and hauling away the old roof, and it can turn up hidden damage that needs fixing. A roof on brand-new construction starts with fresh decking, so there's nothing to remove or repair first.
What Our Process Looks Like
- Free inspection and written estimate. We look at the roof and attic and explain what we find.
- Scheduling and permits. We pull any permit the town requires and schedule around the weather.
- Tear-off and deck repair. Old roofing comes off, and damaged decking is replaced.
- Underlayment, flashing and ventilation. We install new underlayment, ice and water barrier where needed, flashing and roof ventilation.
- Shingles and cleanup. New architectural shingles go on, then we clean up the site and do a final walk-through.
Your new roof is backed by a lifetime manufacturer's warranty and a 10-year workmanship warranty. Financing available.
Get Started on Your Roof Replacement
If you're considering a roof replacement anywhere from Mercer County, NJ to Lackawanna County, PA, we'll give you an honest timeline and a free estimate. Get a ballpark in minutes with our Instant Roof Quote, or call NJ (609) 477-0487 or PA (814) 330-4897. And to keep your new roof in top shape, ask about our roof maintenance service.